Skip to main content
Loading…
This section is included in your selections.

(A) All new subdivision proposals and other proposed development (including proposals for manufactured home parks and subdivisions), greater than 50 lots or five acres, whichever is the lesser, shall:

(1) Identify the area of the special flood hazard area and the elevation of the base flood; and

(2) Identify on the final plans the elevation(s) of the proposed structure(s) and pads. If the site is filled above the base flood, the final lowest floor and grade elevations shall be certified by a registered professional engineer or surveyor and provided to the Floodplain Administrator.

(B) All subdivision proposals and other proposed development shall be consistent with the need to minimize flood damage.

(C) All subdivision proposals and other proposed development shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage.

(D) All subdivision proposals and other proposed development shall provide adequate drainage to reduce exposure to flood hazards. (Prior Code, § 16-5-4) (Am. Ord. 05-956, passed 8-22-2005; Am. Ord. 20-1478, passed 8-24-2020)