(A) All relocation, tiling and reconstruction of irrigation facilities shall be done to standards of the owning utility and City Engineer.

(B) All improvements in the public right of way shall be constructed under the inspection and approval of the City department having jurisdiction. All construction in public rights of way and private access ways shall require a city permit. Construction shall not be commenced until a permit has been issued for such construction, and if work has been discontinued for any reason, it shall not be recontinued until after notifying the Department having jurisdiction.

(C) The locations of all utilities to be installed in public rights of way or in private access ways shall be approved by the City Engineer.

(D) All underground utilities to be installed in streets, private access ways and alleys shall be constructed under city permit prior to the surfacing of such street, private access way or alley. Service stubs to platted lots within the subdivision for underground utilities shall be placed to such length as not to necessitate disturbance of street improvements when service connections are made: underground utilities shall be extended to the boundaries of the plat to provide service connections to abutting unsubdivided land. (Prior Code, § 15-4-3)